extension prices . . . at competative quotes . . .

Discount Plans are the first point of call if you require any quote or tender for your project. We have in just 3 months won half of our clients approval for works on extending the approved design to their home. We will guarantee to get you the most reasonable quote for your project by a team of professional builders.

We know how hard it is to get that right builder today, it has taken us along time to find the best workers. At Discount Plans Ltd we can recommend to you the best. They are fast, normal working day is 8am till 5:30pm Monday to Saturday. They are very skilled and specialize in each of their own trades. They are clean leaving the site clean when the day is over. They are very reliable with the main foreman keeping all workers under a supervised contract.

Below is a set of fees for each common extension design. All fees listed are final finish works.

loft conversions

FOR TERRACED PROPERTY one rear dormer = £20,000 inc VAT.

includes: new dormer, timber stairs, windows, en-suite, all electrics and plumbing, 2x Velux windows to front roof pitch, all complete to plaster finish.

estimated time 6-7 weeks

FOR SEMI DETACHED PROPERTY hip to gable design = £24,000 inc VAT.

includes: new dormer, timber stairs, windows, en-suite, all electrics and plumbing, 2x Velux windows to front pitch, all complete to plaster finish.

estimated time 7-8 weeks

FOR DETACHED PROPERTY hip to gable on both sides and rear dormer = £26,000 inc VAT.

includes: new dormer, timber stairs, windows, en-suite, all electrics and plumbing, 2x Velux windows to front pitch, all complete to plaster finish.

estimated time 7-8 weeks

FOR VICTORIAN TYPE PROPERTY double dormer rear edition = £30,000 inc VAT.

includes: new dormer to main roof and side dormer, timber stairs, windows, en-suite, all electrics and plumbing, 2x Velux windows to front pitch, all complete to plaster finish.

estimated time 7-8 weeks

double storey side extensions

FOR TERRACED PROPERTY = £30,000 inc VAT.

includes; new drainage, foundations, brick and blockwork insulated cavity wall finish, upvc windows, full electrics and water and gas plumbing, pitched insulated tiled roof finish, all complete to plaster finish.

estimated time 7-8 weeks

FOR SEMI DETACHED PROPERTY = £30,000 inc VAT.

includes; new drainage, foundations, brick and blockwork insulated cavity wall finish, upvc windows, full electrics and water and gas plumbing, pitched insulated tiled roof finish, all complete to plaster finish.

estimated time 7-8 weeks

FOR DETACHED PROPERTY = £30,000 inc VAT.

includes; new drainage, foundations, brick and blockwork insulated cavity wall finish, upvc windows, full electrics and water and gas plumbing, pitched insulated tiled roof finish, all complete to plaster finish.

estimated time 7-8 weeks

garage change of use

FOR ALL PROPERTY'S = £4,500 inc VAT.

includes raised garage floor to house level, new foundations, brick and blockwork insulated cavity wall construction, dry lining, full electrics, insulated ceiling, upvc window, all complete to plaster finish.

estimated time 2-3 weeks

house to flat conversions

(estimated price for a 2 bedroom flat with total sqm area of 150sqm)

FOR TERRACED PROPERTY = £20,000 inc VAT.

complete refurbishment, re-plastering, electrics, water and gas plumbing, windows, doors and finishes. all to plaster finish.

estimated time 5-6 weeks

FOR SEMI DETACHED PROPERTY= £20,000 inc VAT.

complete refurbishment, re-plastering, electrics, water and gas plumbing, windows, doors and finishes. all to plaster finish.

estimated time 5-6 weeks

FOR DETACHED PROPERTY = £20,000 inc VAT.

complete refurbishment, re-plastering, electrics, water and gas plumbing, windows, doors and finishes. all to plaster finish.

estimated time 5-6 weeks

flat refurbishments

1 BEDROOM FLAT = £17,500 inc VAT.

complete refurbishment, re-plastering, electrics, water and gas plumbing, windows, doors and finishes. all to plaster finish.

estimated time 4-5 weeks

2 BEDROOM FLAT = £19,500 inc VAT.

complete refurbishment, re-plastering, electrics, water and gas plumbing, windows, doors and finishes. all to plaster finish.

estimated time 4-5 weeks

All builders on site will carry all indemnity insurances and are available for viewing if requested by you the client.

Call 07838135957

DISCOUNT PLANS LTD

DESIGN IN YOUR HOME SERVICE LAPTOP FACILITY

AUTOCAD EXTENSION PLANS BUILDERS QUOTES BUILDING REGULATIONS STRUCTURAL CALCULATIONS

Architectural design studio

HEAD OFFICE

68 Raglan Avenue

Waltham Cross

Herts EN8 8DD

Company No. 05365054

HOURS OF BUSINESS

MONDAY - FRIDAY 9am to 8pm

SAT - SUNDAY 9am to 5pm

email: discountplansltd@gmail.com

telephone: 07838135957

ONLINE QUOTE SERVICE

For a complete professional planning design service, that will not be beaten in price, speed and quality your just minute's away from getting the best deal.

BUILDING QUOTES

Discount Plans Ltd are the first point of call if you require any quote or tender for your project. The Builders that we have recommend to our client's have won and completed projects and are shown on our before and after job page.

QUICK LINKS

You are viewing the text version of this site.

To view the full version please install the Adobe Flash Player and ensure your web browser has JavaScript enabled.

Need help? check the requirements page.

Get Flash Player